EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
EaglesWing
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (363)
Drawings
- (1)
Workshop
- (21)
Supplies
- (24)
Tools
- (21)
Rudder
- (19)
Tail
- (79)
Slats/Flaps
- (60)
Wings
- (86)
Fuel System
- (14)
Lighting
- (33)
-
Purchased Screws,...
-
R/H Wing Recognition...
-
R/H Recognition Light
-
R/H and L/H Position...
-
R/H Taxi/Recognition...
-
R/H Taxi/...
-
R/H Taxi/Recognition...
-
R/H Taxi/Recognition...
-
Purchased #8 dimpled...
-
L/H Taxi/Recognition...
-
L/H Taxi/Recognition...
-
Taxi/ Recognition...
-
Purchased Screws P/N...
-
L/H Taxi/...
-
Taxi/Recognition Lights
-
Picked up LED...
-
Purchased LED...
-
Purchased 2 each...
-
Purchased MS21049L08...
-
Rudder Tail Light...
-
Installed riv-nuts...
-
Purchased Rivet Nuts
-
Drilled tail light...
-
Tail light wiring
-
Tail light cut out
-
Purchased 4-way...
-
Tail light bracket
-
Purchased butt splices
-
Purchased 1/8"...
-
Purchased Rubber...
-
Purchased 12V LED...
-
Purchased tail light...
-
Purchased wire for...
Fuselage
Landing Gear
Controls
Instrument Panel
- (2)
Avionics
Engine
Firewall
Propeller
Interior Finish
Paint / Decals
- (3)
Inspection
Builder Name:
Todd Luebstorf
-
Project:
Zenith CH750SD
-
VIEW REPORTS
Total Hours:
496.7
Total Flight Time:
Start/Last Date:
Dec 12, 2019 - No Finish Date
Engine:
Viking 195
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=EaglesWing
Home or Last Project Picture
Jul 20, 2020
Rudder Tail Light Install
- (2.5 hours)
Category: Lighting
Primed the trailing edge skin where the tail light bracket attaches with zinc phosphate primer.
Used butt splices p/n 320559 (Aircraft Spruce) to connect the tail light to 18 awg. wire. Also used heat shrink p/n HST-1/8 and HST-3/16 (Wicks) to hold the wires together.
Riveted the tail light bracket to the rudder with 10 ea. A4 rivets.
Screwed the tail light to the bracket with #6 screws and tested the light to make sure it works.
20828495-FDCA-4717-82B9-724C515E3562.jpeg
8041B0F9-92A6-4278-8AC6-5E85F59C479D.jpeg
AAE68884-7466-4780-90A2-48105238D22C.jpeg
E29249E5-1F64-4199-9A00-7E4AF004A150.jpeg
E2DA12A8-DBC8-4D39-878A-4F5958C10F7F.jpeg
E62B0F68-F986-413C-9B1F-075D91A5F73B.jpeg
F2AE8BB5-2B11-424E-9366-45C595A01E8D.jpeg
FB855048-9543-408A-9751-AE52D898BB70.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.